Other · Nutrition facts

Riz Long

348 kcal per 100 g, with 7.1 g protein, 79.5 g carbs and 0.5 g fat. Full micronutrients and serving info below.

Compare
Track it in the free Dietly app
Riz LongNutri-Score B
Amount

Showing values for 100 g

348 kcal
Calories
17% of a 2000 kcal day
7.1 g
Protein
8% of calories
79.5 g
Carbs
91% of calories
0.5 g
Fat
1% of calories
Macro split
Protein 8%Carbs 91%Fat 1%

Nutrition facts

per 100 g
Fiber0.5g2% DV
Sugar0.5g
Saturated fat0.5g2% DV
Cholesterol0mg0% DV
Sodium200mg9% DV
Potassium121mg3% DV
Calcium33mg3% DV
Iron1.6mg9% DV
Vitamin C0mg0% DV

% DV = share of the FDA daily value for the selected amount.

Source: Open Food Facts · Confidence: 90% · Barcode (EAN): 3425141200107 · Data last verified:

Barcode

scan it with any barcode app

3425141200107

Dietly — AI Calorie Counter

Log Riz Long in one tap

You just looked it up. Let the app remember it. Dietly tracks your calories and macros automatically, so you hit your goal without the math.

  • Barcode scanner
  • AI photo logging
  • Free to download

Common questions

How many calories are in Riz Long?

Riz Long by Leader Price has 348 kcal per 100 g.

How much protein is in Riz Long?

Riz Long contains 7.1 g of protein per 100 g.

Is Riz Long high in carbs?

Yes — carbohydrates provide 91% of its calories (79.5 g per 100 g, of which 0.5 g is sugar). It also delivers 0.5 g of fiber.

Is Riz Long low in sugar?

Yes — only 0.5 g of sugar per 100 g. Most of its 79.5 g of carbs come from starch and fiber rather than sugar.

Why does Riz Long have a Nutri-Score of B?

Nutri-Score weighs negatives (calories, sugar, saturated fat, sodium) against positives (fiber, protein) per 100 g. It collects almost no negative points (low sugar, saturated fat and sodium). Overall that places it in band B.

How much Riz Long is 100 calories?

About 29 g of Riz Long equals 100 kcal. It is energy-dense, so small amounts add up quickly.

Is Riz Long a good source of iron?

It is a moderate source: 1.6 mg per 100 g, about 9% of the daily value. A 200 g portion covers roughly 18%.

Is Riz Long high in sugar or fat?

Per 100 g it has 0.5 g sugar and 0.5 g fat (0.5 g saturated). Fat provides 1% of its calories, so portion size matters most here.

Want this data in your app?

Free API access — barcode lookup, full-text search, macros, micronutrients and Nutri-Score for every food in the catalog.

Explore the Dietly API